Commissioning of new FTTC CAB's


[link to this post]
 
Does anyone know how long after a CAB is installed and associated works are completed, it will be to BTW commission and make the CAB ready for orders? The CAB I am served by has all work completed (I was speaking with the engs who completed the work to varify this) but the BTW checker is still showing at 31st March.

BTBroadband
DSL Max
Anonymous
(Unregistered)Sat 29-Jan-11 13:03:29
Print Post

Re: Commissioning of new FTTC CAB's


[re: nelix01] [link to this post]
 
Weeks to months, there is no set time and it depends as much on exchange work (inter-exchange splicing and installation of the headend equipment for example) as on the cabinet installations themselves
Standard User nelix01
(member) Sat 29-Jan-11 14:28:31
Print Post

Re: Commissioning of new FTTC CAB's


[re: Anonymous] [link to this post]
 
I have been told that all the infrastructure is in place and it is only waiting on the CAB to go live on the checkers!!!

BTBroadband
DSL Max


Register (or login) on our website and you will not see this ad.

Standard User orly
(experienced) Sat 29-Jan-11 18:54:35
Print Post

Re: Commissioning of new FTTC CAB's


[re: nelix01] [link to this post]
 
It shouldn't be long after it's put in until the checkers show it as available for orders...a matter of weeks.

This assumes the work is complete. Often a cabinet can look finished from the outside and then you'll find workers back a few weeks later adding more to it.

It's not in anyones interest to install new kit and then have it sitting idle longer than necessary.

---
BT Infinity 8th July 2010
Connected to: P23 Kilmaine Road, Bangor, BT19 6DT (NIBA)
600m (approx) to cabinet
25.5mbit down / 7.6mbit up

Previously:
BT Broadband, roughly 4mbit sync
4KM line / 54dB atten / 9dB SNR / Netgear DG834GT