General Discussion
  >> Fibre Broadband


Register (or login) on our website and you will not see this ad.


Pages in this thread: 1 | 2 | (show all)   Print Thread
Standard User 2bagstew
(newbie) Sat 31-May-14 12:40:53
Print Post

Wellfield (NEWLF)


[link to this post]
 
The Wellfied exchange should have been enabled for FTTC by now, but on the BT availability site it say nothing, the superfast site says coming soon May 2014.
The original set date was 13st Dec 2013.
My Cabinet No 2 has had the fibre cabinet installed for months, the installation of the fibre is combination of BT commercial and Digital Durham .

Thanks
Standard User pcoventry76
(knowledge is power) Sat 31-May-14 20:41:38
Print Post

Re: Wellfield (NEWLF)


[re: 2bagstew] [link to this post]
 
In reply to a post by 2bagstew:
The Wellfied exchange should have been enabled for FTTC by now, but on the BT availability site it say nothing, the superfast site says coming soon May 2014.
The original set date was 13st Dec 2013.
My Cabinet No 2 has had the fibre cabinet installed for months, the installation of the fibre is combination of BT commercial and Digital Durham .

Thanks


You are welcome.. But maybe you should be e-mailing them digital durham team?
Standard User 2bagstew
(newbie) Sat 31-May-14 22:22:38
Print Post

Re: Wellfield (NEWLF)


[re: pcoventry76] [link to this post]
 
In reply to a post by pcoventry76:
In reply to a post by 2bagstew:
The Wellfied exchange should have been enabled for FTTC by now, but on the BT availability site it say nothing, the superfast site says coming soon May 2014.
The original set date was 13st Dec 2013.
My Cabinet No 2 has had the fibre cabinet installed for months, the installation of the fibre is combination of BT commercial and Digital Durham .

Thanks


You are welcome.. But maybe you should be e-mailing them digital durham team?


I have already done it will let you know what there response is.
Thanks


Register (or login) on our website and you will not see this ad.

Standard User pcoventry76
(knowledge is power) Sat 31-May-14 22:34:39
Print Post

Re: Wellfield (NEWLF)


[re: 2bagstew] [link to this post]
 
They are the only people really placed to update you. especially as BT no longer reply to e-mails to the NGA address.

I hope it's good news for you smile
Standard User 2bagstew
(learned) Tue 03-Mar-15 15:00:34
Print Post

Re: Wellfield (NEWLF)


[re: 2bagstew] [link to this post]
 
Can anybody shed any news when the commercial cabs are to be switched on by BT.
Thanks
Standard User WWWombat
(knowledge is power) Tue 03-Mar-15 17:05:17
Print Post

Re: Wellfield (NEWLF)


[re: 2bagstew] [link to this post]
 
Interesting result.

Planned cabinets:
1: Commercial, 9/15
2: Commercial, 6/15
3: Commercial, 9/15
4: BDUK, already available
5: Commercial, 9/15
6: BDUK, already available
7: BDUK, already available
8: Commercial, 9/15

These will be end-of-quarter dates, so the actual switch-on is targeted within the quarter ending on that date.
Standard User 2bagstew
(learned) Tue 03-Mar-15 21:29:29
Print Post

Re: Wellfield (NEWLF)


[re: WWWombat] [link to this post]
 
I would have throught they would have been switched on at the same time.
Thanks for the information
Administrator MrSaffron
(staff) Tue 03-Mar-15 22:20:08
Print Post

Re: Wellfield (NEWLF)


[re: 2bagstew] [link to this post]
 
That almost never happens, if bduk cabs are ready they tend to go live asap and same with commercial. Usually a reason why commercial cabs are still delayed eg. Blocked ducts, fibre or even waiting on planning for site for cab

The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.
Standard User 2bagstew
(learned) Thu 12-Mar-15 19:51:28
Print Post

Re: Wellfield (NEWLF)


[re: MrSaffron] [link to this post]
 
Picked this off Digital Durham Facebook page Dated 31/10/14

Update on Wellfield, information provided as follows:
Current Build Status
Cabinet numbers 3, 4 & 6 - 3 stoppages exist in the main duct and are currently scheduled to be cleared by 5th November. Estimated ready for service date end of November.
Cabinet numbers 1,2 & 5 Ė we have been given information as a courtesy by Openreach. These cabs are estimated ready for service date mid-December.
Cabinet 7 Ė this requires a lane closure on the A19 which is due to start on the 12th November for 3 consecutive nights to complete the work in that part of the network. The follow up work will be complete by the end of November as long as no further network issues are encountered. Estimated ready for service date mid-December.
Please note: as ever, all time scales given do include the caveat that the dates can change. Due to the nature of the programme, and as clearly evidenced in Wellfield, itís often that a problem isnít identified until work is taking place

Looking at the information above i would have thought that the commercial cabs would have live by now..
Standard User 2bagstew
(learned) Mon 06-Jul-15 17:52:21
Print Post

Re: Wellfield (NEWLF)


[re: 2bagstew] [link to this post]
 
Does anyone have any info on Wellfield NEWLF Cab 2 will be active the since the date has dropped again. Cab 5 is set for 30/09/15 I'm wondering if this the new date.
Thanks.
Pages in this thread: 1 | 2 | (show all)   Print Thread

Jump to