New capacity / 2nd cabinet dates - placeholders?


[link to this post]
 
Our unviable area appears to have filled up its' first Huawei 288.

The availability checker is claiming that there will be capacity again by 30th July. I suspect this is a placeholder date as I'm 90% sure that an entirely new cabinet is required to provide further capacity.

Confirm / deny re: placeholders anyone?

Thanks.
Standard User simon194
(experienced) Mon 07-Jul-14 13:49:49
Print Post

Re: New capacity / 2nd cabinet dates - placeholders?


[re: Ignitionnet] [link to this post]
 
It most likely wasn't commissioned with a full complement of cards (probably enough for 96 lines maybe) so that will be the date by when extra card(s)/tie-ins will be installed.
Standard User Fastman2
(regular) Mon 07-Jul-14 14:58:02
Print Post

Re: New capacity / 2nd cabinet dates - placeholders?


[re: simon194] [link to this post]
 
simon it will be full -- know thins one Well !!!!


Register (or login) on our website and you will not see this ad.

Standard User Ribble
(experienced) Mon 07-Jul-14 15:59:59
Print Post

Re: New capacity / 2nd cabinet dates - placeholders?


[re: Ignitionnet] [link to this post]
 
Don't think cab was due to be stood until September, could be done sooner though.
Standard User Ignitionnet
(knowledge is power) Mon 07-Jul-14 18:43:35
Print Post

Re: New capacity / 2nd cabinet dates - placeholders?


[re: simon194] [link to this post]
 
In reply to a post by simon194:
It most likely wasn't commissioned with a full complement of cards (probably enough for 96 lines maybe) so that will be the date by when extra card(s)/tie-ins will be installed.


It was commissioned with 48 ports, a single card, which sold out the day it went live. As did the second card installed the following week.

3rd and 4th lasted another 2 months, 5th and I guess 6th another 3.
Standard User Ignitionnet
(knowledge is power) Mon 07-Jul-14 18:44:42
Print Post

Re: New capacity / 2nd cabinet dates - placeholders?


[re: Fastman2] [link to this post]
 
In reply to a post by Fastman2:
simon it will be full -- know thins one Well !!!!


*Snigger* You know exactly what I'm talking about without my needing to mention it. Gotta love that.
Standard User Ignitionnet
(knowledge is power) Mon 07-Jul-14 18:45:30
Print Post

Re: New capacity / 2nd cabinet dates - placeholders?


[re: Ribble] [link to this post]
 
In reply to a post by Ribble:
Don't think cab was due to be stood until September, could be done sooner though.


Matching pair. How cute.
Standard User Ignitionnet
(knowledge is power) Tue 08-Jul-14 00:28:47
Print Post

Re: New capacity / 2nd cabinet dates - placeholders?


[re: Ignitionnet] [link to this post]
 
Okay confirmed that that date is a placeholder, in a similar manner to other 'capacity' relief dates.

>60% take-up, 2nd FTTC build upcoming, extra hardware upgrades needed for node level vectoring to do it anything like right, area fully pre-ducted per guidelines with swept tees feeding properties, LLU-heavy so plenty of Wholesale upside, no VM cable, anyone would think FTTP might have been a good idea. wink

Edited by Ignitionnet (Tue 08-Jul-14 00:46:50)

Standard User WWWombat
(fountain of knowledge) Wed 09-Jul-14 20:32:23
Print Post

Re: New capacity / 2nd cabinet dates - placeholders?


[re: Ignitionnet] [link to this post]
 
In reply to a post by Ignitionnet:
anyone would think FTTP might have been a good idea

I might be wrong, but I think the swept-tee's are only any good if there is also a draw rope running through it.

The current Openreach requirements ask for both a draw rope for the copper and pre-installed blown-fibre tubing running from the joint box to each home.
Standard User Ignitionnet
(knowledge is power) Wed 09-Jul-14 21:24:55
Print Post

Inspection cover molestation


[re: WWWombat] [link to this post]
 
For greenfield perhaps, not likely to be found in brownfield.

That said Openreach have been up to something around here, probably business as usual, a guy opened the 4 inspection covers around here and was up to something, be it just looking or working.