Standard User RichTea23
(newbie) Fri 08-Aug-14 16:08:41
Print Post

Hunslet Exchange Cab 42


[link to this post]
 
Exchange name: Hunslet
Exchange code: MYHLT
Cab : 42


There has been / is currently being a new FTTC cab installed.

I am not sure why but They seem to be digging across the road in the opposite direction from the route the main cable come in from too. (i know this as a few weeks ago they did some work to repair a duct from the "main" road)

How long might it be untill they install the DSLAM / make the service Live?

Various (Dile up) -> clara.net (Dile up) -> TELE2 (Microwave) -> ZeN (ADSL)
Administrator MrSaffron
(staff) Fri 08-Aug-14 16:12:03
Print Post

Re: Hunslet Exchange Cab 42


[re: RichTea23] [link to this post]
 
A few weeks to a few months.

The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.
Standard User RichTea23
(newbie) Mon 11-Aug-14 10:55:45
Print Post

Re: Hunslet Exchange Cab 42


[re: MrSaffron] [link to this post]
 
They have updated the work description and it now shows why they are digging across the road " Works are to include the Northern Powergrid power jointing process".

Various (Dile up) -> clara.net (Dile up) -> TELE2 (Microwave) -> ZeN (ADSL)


Register (or login) on our website and you will not see this ad.

Standard User Ignitionnet
(knowledge is power) Mon 11-Aug-14 11:09:06
Print Post

Re: Hunslet Exchange Cab 42


[re: RichTea23] [link to this post]
 
On the average 2 - 6 weeks once the thing is powered up, so long as there are no problems.
Standard User RichTea23
(newbie) Mon 11-Aug-14 12:57:40
Print Post

Re: Hunslet Exchange Cab 42


[re: Ignitionnet] [link to this post]
 
In reply to a post by Ignitionnet:
Where is cabinet 42 if you don't mind my asking, doesn't seem to be near 40 or 43, one of which is getting enabled under BDUK and the other added to the commercial rollout by someone who was high at the time.


Cab 42 is on Jack Lane NSG Reference 23030317

Various (Dile up) -> clara.net (Dile up) -> TELE2 (Microwave) -> ZeN (ADSL)
Standard User RichTea23
(newbie) Tue 12-Aug-14 10:30:34
Print Post

Re: Hunslet Exchange Cab 42


[re: RichTea23] [link to this post]
 
Wow some one has put a rocket up someone's [censored].

Yesterday the power work was completed and the hole's have all been filled in.

Today BT Openreach are there with a cable role and 3 van's.

Various (Dile up) -> clara.net (Dile up) -> TELE2 (Microwave) -> ZeN (ADSL)
Standard User AndyPandy
(experienced) Tue 12-Aug-14 16:44:01
Print Post

Re: Hunslet Exchange Cab 42


[re: RichTea23] [link to this post]
 
Is it black with a yellow stripe, or something else?

Not clear from your original post if the cabinet is stood or not?

Cheers,
AP


ZeN Office
Fritz!Box 3390
Standard User RichTea23
(newbie) Tue 12-Aug-14 17:15:14
Print Post

Re: Hunslet Exchange Cab 42


[re: AndyPandy] [link to this post]
 
The new cab is installed.

The "cable" was yellow and in a role with radius of about 2 meters.

Various (Dile up) -> clara.net (Dile up) -> TELE2 (Microwave) -> ZeN (ADSL)
Standard User youngsyp
(member) Tue 12-Aug-14 17:20:02
Print Post

Re: Hunslet Exchange Cab 42


[re: RichTea23] [link to this post]
 
Good news, hopefully it won;t be too long until you can order now.

Out of interest, is that the typical procedure? To feed fibre from cab back to exchange? I assumed it would be the other way around...

Paul

ISP: Xilo
Service: Talk & Surf 100
Exchange: SMYG
Cabinet: 4
MSAN: Broadcom
Router: Billion BiPac 7800N
Attenuation:38.5dB - 40dB (weather dependent)
Target SNRM: 3.3dB or 53% of ISP
Current sync: 9823kbps
FTTC cab in place but not enabled..... yet!
Standard User AndyPandy
(experienced) Wed 13-Aug-14 10:19:05
Print Post

Re: Hunslet Exchange Cab 42


[re: RichTea23] [link to this post]
 
I've seen the cable around my area too. I believe it's actually the sheath which they lay in the ducts, then at a later date they blow the actual fibre throug it.

In my case the cable was laid before any cabinets were installed in the village. They're starting to appear now, and I saw an engineer doing some wiring in one of them the other day.

Still waiting for my cabinet to go up though - roadworks planned from tomorrow smile


ZeN Office
Fritz!Box 3390