Openreach Lie


[link to this post]
 
Openreach lied to me,

They advised me that work for FTTC on 20th September. Nothin has happened. So will I have to wait longer or are they just making lies up.

Thanks

Postcode : rh17 7au
Standard User simon194
(experienced) Mon 29-Sep-14 00:14:37
Print Post

Re: Openreach Lie


[re: FredTheB] [link to this post]
 
According to the Go East Sussex website the Dane Hill exchange is confirmed for delivery in Phase 2 between Sep 2014 and Dec 2014 but it also says cabinets 2 and 3 require more work and are scheduled for a later phase.

Cabinet 4 is the only one that's being upgraded in Phase 2.
Standard User FredTheB
(newbie) Mon 29-Sep-14 07:18:18
Print Post

Re: Openreach Lie


[re: simon194] [link to this post]
 
Really?

Cab 3 already has a big new fancy cab anyway


Register (or login) on our website and you will not see this ad.

Standard User Andrue
(knowledge is power) Mon 29-Sep-14 08:37:15
Print Post

Re: Openreach Lie


[re: FredTheB] [link to this post]
 
In reply to a post by FredTheB:
They advised me that work for FTTC on 20th September. Nothin has happened. So will I have to wait longer or are they just making lies up.
I think you're being a bit silly there and taking things too personally. BTor don't have enough interest in you to want to lie. They gave you what they thought was a likely start date. And it slipped. Welcome to the real world and the difficulty of managing large and complex projects.

---
Andrue Cope
Brackley, UK
Standard User zom22
(member) Mon 29-Sep-14 08:48:18
Print Post

Re: Openreach Lie


[re: Andrue] [link to this post]
 
...and it's the reason why BTOR are becoming reluctant to commit to any date for anything.
When problems arise and dates slip then some people seems to get over-upset.
such is life with infrastructure project where all sorts of issues arise en-route.

Anyway I'm delighted the OP is getting FTTC albeit somewhat delayed ( paid for out of my taxes)
Meanwhile I along with others on this forum have been told that my cabinet is not being upgraded under BDUK to FTTC. So that is no FTTC either tomorrow, next year or unless more funds are found from somewhere to pay for it (as it was explained to me) maybe ever.

So I wish the OP well when FTTC finally arrives for them.
Standard User Galoka
(learned) Mon 29-Sep-14 09:02:16
Print Post

Re: Openreach Lie


[re: FredTheB] [link to this post]
 
In reply to a post by FredTheB:
Really?

Cab 3 already has a big new fancy cab anyway


Our FTTC cabinet was in place many months (maybe over a year, I can't remember) before the work to connect everything up and run the fibre was carried out. And completion was about 9 months after the intial date they gave to go live. As is the way with such things
Standard User Taras
(eat-sleep-adslguide) Mon 29-Sep-14 10:30:14
Print Post

Re: Openreach Lie


[re: FredTheB] [link to this post]
 
In reply to a post by FredTheB:
Really?

Cab 3 already has a big new fancy cab anyway


Power and blowing the fibre can and sadly in your case cause delays ..
Standard User Mark07
(newbie) Mon 29-Sep-14 12:44:48
Print Post

Re: Openreach Lie


[re: Taras] [link to this post]
 
It took 8 months from my cab being installed to being able to order, apparently a lot of the ducts hadn't been opened in around 30 years and many had collapsed and needed clearing
Standard User Taras
(eat-sleep-adslguide) Mon 29-Sep-14 14:08:29
Print Post

Re: Openreach Lie


[re: Mark07] [link to this post]
 
In reply to a post by Mark07:
It took 8 months from my cab being installed to being able to order, apparently a lot of the ducts hadn't been opened in around 30 years and many had collapsed and needed clearing


exactly!!!!!