Hi,

We had the two FTTC cabinets for CMETT installed in November 2014 and the RFS date was showing as 31/12/2014.

Then Dec/Jan I cannot remeber which some roadworks for power to the cabs were put in place.

I have tried asking the BDUK for an update but they have no information.

Would be grateful if anyone can give me an update or if there is any indication of a go live date for the Ettington exchange.

Thanks

zen max 6400/343
Standard User FredTheB
(learned) Wed 25-Feb-15 12:31:16
Print Post

Re: CMETT, cabs installed November still not live


[re: jjones] [link to this post]
 
If you can provide me with a postcode, I can check.

Thanks
Standard User jjones
(member) Wed 25-Feb-15 13:54:02
Print Post

Re: CMETT, cabs installed November still not live


[re: FredTheB] [link to this post]
 
Cv37 7sn

Thanks

zen max 6400/343


Register (or login) on our website and you will not see this ad.

Standard User FredTheB
(learned) Wed 25-Feb-15 15:12:08
Print Post

Re: CMETT, cabs installed November still not live


[re: jjones] [link to this post]
 
According to my sources, your exchange will be fibre enabled by the end of March. Your cabinets 1 and 2 will be enabled shortly afterwards. There are no plans for Cab 3
Standard User PaulKirby
(committed) Wed 25-Feb-15 15:26:59
Print Post

Re: CMETT, cabs installed November still not live


[re: FredTheB] [link to this post]
 
In reply to a post by FredTheB:
According to my sources, your exchange will be fibre enabled by the end of March. Your cabinets 1 and 2 will be enabled shortly afterwards. There are no plans for Cab 3
Don't you mean Cabinets 2 and 3 are down for fibre, Cabinets 1 and 4 have no fibre info on them yet.

Paul
Standard User FredTheB
(learned) Wed 25-Feb-15 17:15:50
Print Post

Re: CMETT, cabs installed November still not live


[re: PaulKirby] [link to this post]
 
Sorry,

My bad, yes, 1&4 have no data. 2&3 has FTTC planned
Standard User jjones
(member) Wed 25-Feb-15 20:16:25
Print Post

Re: CMETT, cabs installed November still not live


[re: FredTheB] [link to this post]
 
Cheers guys, just a few more weeks to go then smile

zen max 6400/343
Standard User FredTheB
(learned) Wed 25-Feb-15 21:20:20
Print Post

Re: CMETT, cabs installed November still not live


[re: jjones] [link to this post]
 
your lucky, I have to wait until december frown
Standard User PaulKirby
(committed) Wed 25-Feb-15 21:25:55
Print Post

Re: CMETT, cabs installed November still not live


[re: FredTheB] [link to this post]
 
In reply to a post by FredTheB:
your lucky, I have to wait until december frown
I'm still waiting since 2011 LOL.

Paul
Standard User jjones
(member) Wed 04-Mar-15 10:38:47
Print Post

Re: CMETT, cabs installed November still not live


[re: PaulKirby] [link to this post]
 