Standard User Countrybump
(newbie) Sun 04-Oct-15 08:42:21
Print Post

Clavering EACLV cabinet 2 but when are we likely to go live


[link to this post]
 
Hi

Looking up details for our cabinet and exchange and am a little baffled as to when it may go live. We are cab 2. Any ideas please? I've looked up the following :

Availability Phase Properties Passed Vendor Approx Post Code
Cabinet P1 Fibre Not Available CB11 4PB
Cabinet P2 Fibre Not Available (exchange ready 24th October 2014) Phase BDUK Essex 14a Huawei CB11 4RU
Cabinet P3 Fibre Not Available CB11 4EX
Cabinet P5 Fibre Not Available (exchange ready 24th October 2014) Phase BDUK Essex 14b Huawei CB11 3UN
Exchange 4 Fibre Not Available

Many thanks
Administrator MrSaffron
(staff) Sun 04-Oct-15 10:17:55
Print Post

Re: Clavering EACLV cabinet 2 but when are we likely to go l


[re: Countrybump] [link to this post]
 
Not before 16th November when some work to clear ducts takes place so fibre ducting can be put in place to reach the cabinet.

http://roadworks.org/ has the details if you toggle the search for the next few months.

The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.
Standard User PaulKirby
(experienced) Sun 04-Oct-15 12:38:18
Print Post

Re: Clavering EACLV cabinet 2 but when are we likely to go l


[re: Countrybump] [link to this post]
 
Like Andrew has said there is work due, but not until the middle of November.

Work Start Date: 16th November 2015
Work End Date: 18th November 2015

Work State Name: Advanced planning

Work Description: CLAVERING - PCP2 - 297542 - BDUK - Excavate onto BT ducts for the clearance of duct blockages in FW/VERGE/CW to facilitate spine cabling works.

Work Location: Valance Road, Clavering, from o/s Butts Green Cottage going East for Approx 205metres

Google Maps (Lat, Lon): 51.9841758, 0.11540255
Hope that helps.

Paul


Register (or login) on our website and you will not see this ad.

Standard User Countrybump
(newbie) Sun 04-Oct-15 13:01:10
Print Post

Re: Clavering EACLV cabinet 2 but when are we likely to go l


[re: PaulKirby] [link to this post]
 
That's great. Thanks both. Mean I can stop checking daily!
Standard User PaulKirby
(experienced) Sun 04-Oct-15 15:22:37
Print Post

Re: Clavering EACLV cabinet 2 but when are we likely to go l


[re: Countrybump] [link to this post]
 
In reply to a post by Countrybump:
That's great. Thanks both. Mean I can stop checking daily!
Heh, I would check on a weekly basis near the end of this month for that, just in case it gets cancelled which it can and does happen.

We had chamber work which consisted of removing the old smaller chamber and building the new standard size, this work was down to be done 4 times and for the first 3 times for some reason it was never done, luckily forth time a charm.

Paul