General Discussion
  >> Fibre Broadband


Register (or login) on our website and you will not see this ad.


Pages in this thread: 1 | [2] | (show all)   Print Thread
Standard User craski
(member) Sun 19-Mar-17 19:10:56
Print Post

Re: 1yr on, FTTC still in 'field survey' stage


[re: AndyHCZ] [link to this post]
 
I wish Digital Scotland would provide information as good as this!

Zen Unlimited Fibre Office BQM
Standard User bdo21
(regular) Sun 19-Mar-17 20:59:01
Print Post

Re: 1yr on, FTTC still in 'field survey' stage


[re: AndyHCZ] [link to this post]
 
In reply to a post by AndyHCZ:
According to Connected Counties, your cabinet should be done under Phase 3 which started 1 Jan 2017 and ends 30 Mar 2018 - http://www.connectedcounties.org/assets/file/List-of...


Thanks very much! I had looked at this file before but the postcode for the telephone number isn't listed and I tried contacting Connected Counties but they were useless. If the cabinet is being upgraded, that should be fine, even though it is not listed here.

There is nothing shown in roadworks.org for the next 12months...
Standard User lee111s
(experienced) Sun 19-Mar-17 21:19:49
Print Post

Re: 1yr on, FTTC still in 'field survey' stage


[re: bdo21] [link to this post]
 
BT's notice of roadworks is only usually a couple of weeks.

Just because there's nothing showing for the next 12 months doesn't mean nothing will happen in the next 12 months.


Register (or login) on our website and you will not see this ad.

Pages in this thread: 1 | [2] | (show all)   Print Thread

Jump to