I think Plusnet usually get the broadband across first, then take the phone line later. But from LLU that sounds dodgy to me because of the physical connection changes in the exchange.
I believe the correct way is for Plusnet to order the line transfer, preferably with a Linked Order Number, and to submit that Linked Order number with the broadband MAC to Openreach.
My broadband basic info/help site - www.robertos.me.uk
My domains,website and mail hosting - Tsohost.
Internet connection - Plusnet Value Fibre.
"Where talent is a dwarf, self-esteem is a giant." - Jean-Antoine Petit-Senn.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~