I have a question for any plusnet reps on this forum.
In early March I'm moving into a house that currently does not have an Openreach line. The current occupants were recently quoted a two-month lead time for getting a line provided, not sure why it's this long but there currently isn't a drop-wire to the house from the DP on the other side of the road.
I want to signup with plusnet now so the line provisioning process starts now and should be complete by early March. At present only standard ADSL is available but according to Openreach an FTTC service should be available around March time (the fibre cab is in place and has power, just awaiting a duct clean and connection to the fibre spine).
Obviously my only option if ordering now is to sign up for standard ADSL but when I upgrade to fibre what happens with the new customer discount (currently half price std ADSL for 12 months)? Is there anyway of separating the line provision and broadband service? That way if I wait a little longer before ordering the broadband service I might be able to go straight to fibre.
Cheers.



Print Thread
MaryHinge