|
The following information is provided on the BT Openreach website and has stayed the same for quite some time.
Does coming soon usually mean within a month or two? I understand that an EO line poses a challenge but not an insurmountable one.
Your fibre service is connected from this exchange.
Exchange name: Dornie
Exchange status: Coming soon
Technology: Pending - EO Line
|
|
Dornie as in on the exchange ACHILTIBUIE?
|
The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.
|
|
Don't think that can be right as Achiltibuie is a considerable distance from Dornie.
|
Register (or login) on our website and you will not see this ad.
|
|
Please can you copy and paste what the BT Wholesale checker sayd for your phone number. That is better for this purpose than the one you are using.
Can we have the table and the line above it, with your phone number removed of course  .
The indispensable man or woman passes from the scene, and what happens next is more or less the same thing as was happening before.
My broadband basic info/help site - www.robertos.me.uk. Domains, site and mail hosting - Tsohost.
Connection - AAISP Home::1 80/20. Sync 59504/15641kbps @ 600m. - BQM
|
|
BT BROADBAND AVAILABILITY CHECKER
Telephone Number on Exchange DORNIE
Featured Products
Downstream Line Rate(Mbps)
Upstream Line Rate(Mbps)
Downstream Range(Mbps)
Availability Date
ADSL Max Up to 8 -- 7 to 8 Available
Fixed Rate 2 -- -- Available
For all ADSL and WBC Fibre to the Cabinet (FTTC or WBC SOGEA) services, the stable line rate will be determined during the first 10 days of service usage.
There are no left in jumpers available on this line. This line is on a Market A Exchange.
Throughput/download speeds will be less than line rates and can be affected by a number of factors within and external to BT's network, Communication Providers' networks and within customer premises.
The Stop Sale date for Datastream is from 30-Jun-2012; the Formal Retirement date for Datastream is from 30-Jun-2014.
If the End User wishes to migrate from their current Broadband supplier they will need to contact the Broadband supplier they want to take service from to arrange for the service to be migrated.
Note: Please note that postcode and address check results are indicative only. Most accurate results can be obtained from a telephone number check.
Thank you for your interest.
|
|
NSDNI Dornie exchange might (and its a big might) be getting some FTTP for some of the EO lines. When - no idea and in some other areas this has been downgraded to delivering a cabinet with VDSL2 instead.
|
The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.
|
|
You're better off getting in touch with a fella called Nick Scroggie from Highlands & Islands Enterprise - BDUK authority responsible for the Highlands area. He was very helpful and gave me a fairly accurate go live date for my FTTC cab, just outside of Inverness. I would email him your full address (incl postcode) & tel number.
[email protected]
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°
TalkTalk Business Fibre 80000/19999 kbps
Powered by Huawei HG612 & Linksys EA8500
My Broadband Quality Monitor
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°
|
|
Thanks to all that responded to my question. I have as baby_frogmella suggested emailed Mr Scroggie and I await his reply.
|
|
Time will tell if this data proves to be accurate, things change.
Enter details as required e.g. "Locality or Post Code to Lookup" :- Dornie, then click the "Lookup Locality" tab/button.
https://www.telecom-tariffs.co.uk/codelook.htm?xid=5...
.
plusnet user
Edited by Apprentice (Sun 06-Mar-16 10:52:21)
|
|
Thank you Apprentice, followed your link and it states the following.
Fibre: FTTC 30th June 2016
Great news if it is correct, only fly in the ointment is there are no cabinets here all lines are EO. I can only hope that they intend to put cabinets outside the tiny exchange.
|
|
The bad news is that quarter-end dates are nearly always place-holders and just mean it is on the list to be done. As late as two days before the date it can slip 3 or 6 months to another quarter end.
If it slips a shorter length of time to what looks like a scheduled date, things start to look hopeful.
The indispensable man or woman passes from the scene, and what happens next is more or less the same thing as was happening before.
My broadband basic info/help site - www.robertos.me.uk. Domains, site and mail hosting - Tsohost.
Connection - AAISP Home::1 80/20. Sync 59504/15641kbps @ 600m. - BQM
|
|
RobertoS how right you were, the scheduled date has just changed from 30th June to end December. Looks like it's all just LaLa land stuff with no real information available.
Such a pity as a shiny new green cabinet was installed yesterday so we all thought yippee finally well get a proper broadband service at long last.
Edited by corsa57 (Fri 01-Jul-16 23:18:02)
|
|
Just outside the exchange? If so, if it is for your area's EO lines not some other area's, then at least it's progress.
Kindness isn't going to cure the world of all its awfulness but it's a good place to begin. Daisy Ridley.
My broadband basic info/help site - www.robertos.me.uk. Domains, site and mail hosting - Tsohost.
Connection - AAISP Home::1 80/20. Sync 59500/14989kbps @ 600m. - BQM
|