However today the order status changed to "an engineer does not need to vist your premisses" etc.
So i phone BT and was told open reach had rejected my order as the cabinet is not ready
The line checker said it was and i could expect 29.5 meg
I am on the Milton Keynes Exchange and would love to finally have a line speed greater than a measley 1meg
Any ideas how i can find out when my cabinet is going to be ready?
A disapointed Simon



Pages in this thread:
Print Thread
deleted