Having looked at the OR spreadsheet the Thatcham exchange is part of phase 5b but PCP 2 (which covers 18% of RG19 9JH) appears not to be part of the roll out. This PCP seems to cover several other post codes which are not included either.
There is no mention of post code RG19 9JH being covered by the Hermitage exchange in the spreadsheet although that exchange is part of the roll out as well.
Remember every household is not planned to be covered by FTTC and villages served by two exchanges are the places where these oddities will occur. If the north side PCP doesnt serve sufficient households within the range of VDSL then it won't get done. The uplift is showing as 4.2 - if that is 4 times current speed of, say, 2MB/s that is only 8MB/s which isnt what FTTC is about at present.