If you setup a search or RSS feed from ELGIN then you will get sent details of the streetworks permits when they have been accepted for works within the area.
Doing the above will give you an idea of when BT Openreach works are going to take place to install the cab (the works details will often say NGA Cabinet install or something similar). If there is nothing on ELGIN now then don't worry. BT Openreach
must have a streetworks permit to install the cabinet whenever they plan to do so.
vFast Ltd
Downstream ~24336.33 kbit/s - ~2970.74 KB/s
Upstream ~10224.86 kbit/s - ~1248.15 KB/s