My town is due to have FTTC by the end of June - little over 7 weeks away - yet out of the 34 cabs attached to the exchange I have found ~22 of them but there is not a single sign of life.
I'm guessing this means the rollout is slipping, but can it be estimated by how much?
How long from cabs going in to the service going live?



Print Thread
deleted



