My lad was talking to an Openreach engineering connecting the fibre at what we think is Cabinet 22 (near France Street ?) yesterday. Engineer said barring major issues with power and blocked ducts it should be 4 to 6 weeks before we can start ordering on all the cabinets around Daisy Hill.
Engineer was a bit hacked off as where he lives FTTC has been done but not his cabinet and even though he'd offered to do his bit for free his cabinet was not on the current plan for deployment ....how frustrating must that be.
Let's hope he was right on the 4 to 6 weeks.