Cab installed 3/2/12
Tie Cable 27/2/12
Power installed 7/3/12
First attempt at clearing blocked ducts 8/3/12-12/3/12
Second attempt at clearing blocked ducts / fibre install 31/3/12 (a Saturday!)
Exchange RFS originally due 31/3/12
New exchange RFS prediction 30/6/12
In the meantime National Grid Gas have dug up the street, smashed up the BT ducting leaving cable exposed underground (and then covered over the evidence) and partially collapsed a cable pit due to their deep excavations adjacent to the pavement. So heaven knows if it'll still work when BT eventually get around to putting it into service