and I'm connected up and running at 80/20. A huge improvement on the previous 6/1 we got with ADSL2+
We're a couple of hundred yards from our cabinet and the only other connection is a BT test circuit.
Annoyingly the cabinet I'm connected to was listed as phase 6A and I'm not in a conservation area - this should have been done 18 months ago but still no streetworks.
Tools.
Register (or login) on our website and you will not see this ad.