SO bt contractors show up have cab doors wide open they dig a hole aroung 1ft wide around 10ft long heading away from old cab.
then....
They just filled it back in and tarmacked back over hole and left

checked other install, they got shiny new fibre cab.
not sure if I should be worried or not, would just like to see fibre cab in place, at least at that point Id know 100% will be getting it.