Having just looked on roadworks.org for future works they give this
Works Start: 07 Nov
End: 12 Nov
Medium impact, delays possible
Location: O/S 1 MARGARET ROAD
Description: Build 1 cabinet and base (600mm x 300mm x 1000mm),Install 2m of 2 poly ducts in Footway
They question is as they have already installed a Fibre Cabinet, although not yet live, what cabinet are BT going to be installing, as can't believe that they will be installing a 2nd Fibre Cab before first one goes live. Or have BT been told to move the Cabinet they have already put in. Map of Location.
Shows normal BT Cab on right in Bushes, Current Fibre Cab has been installed on opposite pavement, about level with small bush, just before speed humps. Or do i just wait until November to see what they do.