My Hawkinge is being enabled for FTTC most of the Fibre Cabs have been installed along with power.
What work is required at the actual exchange I know that fibre needs to be run from the Exchange to the FTTC Cabs which I believe has been done. The Exchange is 21CN Enabled for ADSL 2+ - but just curious how much is needed to be done at an exchange is most cases?
TIA
