FTTC has come to my exchange. I have noticed 4 new small fttc cabs have already been installed locally within the last fortnight. My cab has yet to be done. But,checking on http://roadworks.org/ It is showing that BT will be doing work this week directly across the road from my cab. The info on roadworks.org states:
"Description : Build 1 concrete chamber 2315mm x 737mm x 1565mm deep in Footway,Install 2m of 2 poly ducts in Footway,Install 4m of 2 poly ducts in Carriageway"
Could this be for FTTC for my cab? The concrete chamber seems large?
Many thanks.



Pages in this thread:
Print Thread
deleted