My cab in Shrewsbury (64) was slated for FTTC/P on the old 2011 leaked spreadsheet - since then FTTC has come to many areas in the town, but not my cab. BTOR did carry out some work around the streets near to my cab and it seems that fibre has been brought to the poles (I can see it coiled up hanging on the poles I think) but for probably 9 months now, nothing seems to have happened. I'm still on ADSL2+.
The BTOR checker for my number has no mention of fibre at all.
I'm not complaining as my speeds are OK, but I'm just curious as to what the plans are for these FTTC/P cabs? There were a lot of them in the leaked spreadsheet - is it likely that they will turn into FTTPoD instead and I will need to pay (at some indeterminate time in the future) to get the fibre to the house?