HI all,
My exchange has been live for just under 3 weeks since then they have made 4 of the 14 cabs live, but unluckly for me my cab hasnt been made live.
Thing is I think its due to the cab(11) before mine numbers wise was delayed in the build phase since its only around 200m away from my cab (12), I seen them doing the power for the cab around a month and half ago but not seen any disruption for the duct install from the old cab to the fiber cab as it is 50-70m away from the old cab,
So I am thinking they were using the same ducts to feed the cabs and could have been a blockage since last week cab 11 has a fiber cab next to it and power was done the next day.
Also I seen a cab now a month ago before the exchange went live I seen a guy splicing the fiber and that is not even showing speed estimates as yet on BTW checker
Thanks and sorry if I have missed any information
|
|
|
Thanks and sorry if I have missed any information
You didn't mention the exchange.
|
|
|
|
Knew I forgot something lol
Exchange is Drumchapel
|
|
Register (or login) on our website and you will not see this ad.
|
|
|
|
I reckon the copper ties arnt done
|
|
|
|
Doesn't sound good.. Does this take a while to complete?
|
|
|
Listened to the cab this morning still silent..
Edited by deleted (Tue 29-Apr-14 08:07:35)
|
|
|
|
Power and fibre done
|
|
|
|
Can I ask how do you know that lol
|
|
|
|
Sixth sense
|
|
|
|
Haha has the fiber to the old cab been done yet?
|
|
|
|
The fibre for FTTC cab 12 is complete
|
|
|
|
Sorry, I thought you were meaning to fttc cab was powered and fiber to it but it's not been connected to the copper cab
|
|
|
Fibre only goes to the FTTC cab, the tie cables run between the PCP and FTTC cab. When your line is activated the engineer basically cuts into your line in the PCP cab and connects one pair of tie cables to one side and another pair to the other side. So now your line runs through the FTTC cab.
Ribble knows, so now you know
|
|
|
|
Well there you go then lol.. I hope that has been done too unless that's the hold up
|
|
|
I disagree with the copper ties not being complete for Cabinet 12, there was a trench dug up for the ties about a month ago.
Cabinet 11 is now there and has ducting ties complete, it looks like..... what the hell is the hold up !
Edited by deleted (Fri 02-May-14 20:50:40)
|
|
|
|
I must have missed that bud when I was at work,
What I don't get is cab 13 is sitting ready with a date of 31st of may on the checker and similar ones had this date for a few days then went live, I seen cab 15 getting the fiber spliced on the 27th of march and that is also still not even giving estimates of speed.
only about 3 or 4 cabs have been activated
|
|
|
|
i have no clue mate, maybe waiting for the openreach engineers to install and configure DSLAMs maybe.
|
|
|
|
I thought all the kit was in the cab pre-install
|
|
|
|
Cab 11 is due to be commissioned soon
Cab 12 copper ties
Cab13 failed commissioning. To be resolved
Cab14 DSLAM not stood yet
Cab15 copper ties
|
|
|
|
Thanks,
Any estimated completion time scales?
|
|
|
|
As and when
|
|
|
|
thanks for the info ribble, just waiting for PCP11 to be available on btwholesale checker.
|
|
|
|
When pcp11 shows as avaliable 30th of may when you put in a phone number number that's on that cab it should be live a few days later.
Or what I have noticed all cabs that are complete have a silver lock on the front of them
|
|
|
Going by other cabs.. Cab 11 is finished as it has a new silver lock on the front.
Don't get openreach finish a delayed cab before 2 other cabs that have been stood since December
Edited by deleted (Wed 07-May-14 18:22:28)
|
|
|
|
Cab 11 giving speed estimates now
|
|
|
|
Do you have any update on pcp12?
|
|
|
indeeed it is
|
|
|
|
Have you seen any work done to cab 12 recently
|
|
|
|
Is there any updates as yet as work keeps getting put back?
|
|
|
|
Probably looking at next month now
|