The main town went live last month along with the second most populated village in the area. We're the third most populated village in the area and were next on the list for FTTC, the cabinets went in months ago and for the last couple of weeks we had droves of contractors (Telnet) connecting them all up. I saw them lay the fiber to my cabinet last week. Since then they have moved on to the next village over. The village I live in has had a fiber backbone for years that is rented from BT by the university, I'm assuming because of this they won't need to lay fiber to the exchange which I haven't seen them doing. They just seem to have been connecting all the smaller cabinets (Huawei 288 max type) up to a gigantic PCP that serves the university/student halls.
The Superfast Wales date on the rollout map was June 2014 before it went green. In a case such as this when everything has been seemly connected how much longer can it take? I've been checking the BT Wholesale checker everyday to no avail.
Edited by deleted (Tue 27-May-14 19:42:13)