So the new cab I am due to be connected to was installed back in May and then works began/finished began down the road at the start of last month to connect it to the mains. Is there any reason I shouldn't be able to order FTTC at this point? It's kinda frustrating trying to watch events when things stutter uncontrollably.
I'm connected to Cab 45 on Arrowebrook just encase someone is able to look in to it for me.



Print Thread
