Does anyone know the status of Blythe Bridge (WMBLY) cabinet 17? The current go live date is the end of this month, but it's had a go live date since Aug 13 so that means nothing, and will probably slip another 3 months very soon.
There is still no power to the cab(s) as far as I can tell as they're silent. I noticed that Western Power were doing a load of work at the start of last month according to roadworks.org, but that's doesn't seem to have been related as nothing has changed since, and I was on holiday at the time so couldn't even go and ask if it was BT related.
Thanks