We live in the Fastershire area and our cabinet according to the postcode and number checker was originally programmed to be updated by June 2014. This subsequently slipped to December 2014. We are now informed that the Cabinet is under review and will be considered in the next funding round, presumably this means it also may not be upgraded.
The Cabinet is on the Guiting Power exchange SSGPR which has been upgraded and a new Cabinet installed at Hawling for EO lines however the old Cabinets 1 & 2 have not been upgraded. For Cabinet 1 about 55% of the lines don't meet the 2Mbps USC. Looking for any one who has also had a cabinet dropped from the Phase 1 rural rollout or has any knowledge of why our cabinet presumably after going through the engineering evaluation might be dropped???