|
|
|
Hi,
We had the two FTTC cabinets for CMETT installed in November 2014 and the RFS date was showing as 31/12/2014.
Then Dec/Jan I cannot remeber which some roadworks for power to the cabs were put in place.
I have tried asking the BDUK for an update but they have no information.
Would be grateful if anyone can give me an update or if there is any indication of a go live date for the Ettington exchange.
Thanks
|
|
|
|
If you can provide me with a postcode, I can check.
Thanks
|
|
|
|
Cv37 7sn
Thanks
|
|
Register (or login) on our website and you will not see this ad.
|
|
|
|
According to my sources, your exchange will be fibre enabled by the end of March. Your cabinets 1 and 2 will be enabled shortly afterwards. There are no plans for Cab 3
|
|
|
According to my sources, your exchange will be fibre enabled by the end of March. Your cabinets 1 and 2 will be enabled shortly afterwards. There are no plans for Cab 3 Don't you mean Cabinets 2 and 3 are down for fibre, Cabinets 1 and 4 have no fibre info on them yet.
Paul
|
|
|
|
Sorry,
My bad, yes, 1&4 have no data. 2&3 has FTTC planned
|
|
|
Cheers guys, just a few more weeks to go then
|
|
|
your lucky, I have to wait until december
|
|
|
your lucky, I have to wait until december  I'm still waiting since 2011 LOL.
Paul
|
|
|
|
Well saw OpenReach vans with a large coil of what looked like hose pipe so I guess they were trying to unblock the duct for the Halford FTTC cabinet, and what was more impressive was that this was on a Sunday!
|