Ok, I have found out the following:
Exchange Name: Codsall
Exchange Code: CMCOD
County: Staffordshire
Cabinet: 9
Fibre Phase: Phase 10a 2013
Fibre Information: FTTC Available from 28th May 2014
Result Count: 7 (13% of Post Code)
Cabinet: 14
Fibre Phase: Phase 10a 2013
Fibre Information: FTTC Available from 4th March 2014
Result Count: 8 (14% of Post Code)
Cabinet: EO -> 15
Fibre Phase: BDUK Staffordshire 13b
Fibre Information: FTTC Planned (exchange ready 21st June 2010)
Fibre Description: Remaining EO Lines for postcode WV8 1PG are scheduled to be moved over to PCP 15
Fibre Description: This is expected to be done and ready by end of June 2015 according to the superfaststaffordshire site.
Result Count: 40 (73% of Post Code)
[WV8 1PG]
� Has 8 result(s) connected to Cabinet 14 with FTTC with approximate speeds around the following:
� Range A: 76.9 -> 80.0 (downstream) 20.0 -> 20.0 (upstream)
� Range B: 57.8 -> 80.0 (downstream) 5.0 -> 20.0 (upstream)
� Availability Date: Available
� Has 7 result(s) connected to Cabinet 9 with FTTC with approximate speeds around the following:
� Range A: 74.0 -> 80.0 (downstream) 20.0 -> 20.0 (upstream)
� Range B: 61.9 -> 80.0 (downstream) 12.2 -> 20.0 (upstream)
� Availability Date: Available
� Has 40 result(s) connected to an EO (Exchange Only) line with ADSLx with approximate speeds around the following:
� ADSLx (Worst): Up to 17.0 (downstream rate) -- (upsrteam rate) 10.0 to 19.5 (downstream range)
� ADSLx (Best): Up to 17.0 (downstream rate) -- (upsrteam rate) 10.0 to 19.5 (downstream range)
� Availability Date: ~30 June 2015
Please note that these speeds are using BT's DSL Checker and uses the lowest and highest values for that postcode and cabinet.
� Had at least 1 issue retrieving information from the BT DSL Checker.
So according to the superfaststaffordshire site your postcode is expected delivery by June 2015 so not long.
Your postcode is split over 2 cabinets (9 and 14 which was upgraded to fibre May and March 2014 via the commercial rollout) and some EO Lines, the good news is that the EO Lines for your postcode seem to be down to be moved over to cabinet 15 and down to be upgraded to fibre by the end of June 2015 so it says on the superfaststaffordshire site.
So going by where you haven't got fibre yet, I am assuming your one of the EO lines.
So I guess not long now then, please be aware that issues can pop up and delay things.
Paul