Build 1 concrete chamber 915mm x 445mm x 965mm deep in Footway,Build 1 precast jointing chamber (725mm x 225mm) 600mm depDamn roadwords cut off the remaining text.
So I am assuming (well hoping) its a chamber/pit ready for the fibre to be blown through due to its the side of the road the poles are on, and is at a junction of one of our side roads that has a fibre node at the junction the other end off the main road.
But I am guessing it is a new pit due to we are part of the FTTP Commercial Project which was confirmed by BT over the phone and email.
Your due to be upgraded under a FTTP (Fibre to the Premises project). It is estimated that a large number of customers will benefit from FTTP service in your area.along with other stuff that I won't say.
And that we are going to get it soon, to be honest I think the FTTP Commercial Project has been delayed due to them being very busy trying to keep up with all the BDUK rollout, deadlines and stuff, so I do understand that.
But if its for the fibre this could allow for around 635 addresses to get FTTP down the remaining part of our road along with the remaining side roads that been sitting waiting just for the fibre to be blown since end of 2011
But knowing our luck so far, it's probably just for a new copper lines LOL
I might take a wander/stagger down my road (only 9 doors down the road) when its due to start middle of next week and ask the engineers.
*** update ***
Just took a look on Google Maps at that location and to me it seems like they are removing an old narrow and small pit down the road and replacing it with a new larger one like the one we have by our pole.
Here is an image of both pits.
But I will take a look and maybe take some pictures if I get there the right time and if my meds haven't warn off
Thanks
Paul
Edited by PaulKirby (Sat 02-May-15 05:34:40)



Pages in this thread:
Print Thread
