Hey
I haven't been able to find out any information anywhere else - 'When and Where' BT site just loads up a questionmark when I enter my details.
My exchange is in a village that serves around 600 properties. I'm led to believe that 300~ of these are Exchange Only (I am exchange only). With the rest split between 2 normal green cabs. We had a lady come and chat at the village hall over 1 year ago saying that around half the village would have fibre in the last part of 2015.
Anyway... there are now road works happening between the exchange and a few of those BT slabs in the pavement the other side of the road. They have finished digging the road and tarmaced it over. They have also dug out what looks to be the foundations for a cabinet which is about 100metres from the exchange. I found this on roadworks.org:
pcp3 10 DAY POWER AND DSLAM:STREET CABINET & POWER INSTALLATION. Excavate to lay approx 3m BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay approx 16m duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site.
Does this mean fibre is coming? If so, any idea if it is for the Exchange Only users? The cabinet foundations they have dug are no where near the 2 normal green cabinets.