Hi, I tried BT Wholesale with my phone number but it didn't recognise it as its a Sky Talk number so I used my full postal address - this is what it came back with:-
"BT BROADBAND AVAILABILITY CHECKER
Address [removed house number], PERTH, PH2 8AL on Exchange PERTH is served by Cabinet 18
Featured Products
Downstream Line Rate(Mbps)
Upstream Line Rate(Mbps)
Downstream Range(Mbps)
Availability Date
High
Low
High
Low
FTTC Range A (Clean) 36.3 27.4 7.5 5.7 -- 30-Sep-15
FTTC Range B (Impacted) 29.1 15 7.2 3.4 -- 30-Sep-15
WBC ADSL 2+ Up to 8 -- 5.5 to 12.5 Available
WBC ADSL 2+ Annex M Up to 8 Up to 1 5.5 to 12.5 Available
ADSL Max Up to 5.5 -- 4.5 to 8 Available
WBC Fixed Rate 2 -- -- Available
Fixed Rate 2 -- -- Available
Other Offerings
FTTP on Demand 330 30 -- 30-Sep-15
Fibre Multicast -- -- -- 30-Sep-15
Copper Multicast -- -- -- Available
FTTC is currently not available on this cabinet due to following reasons:- Sorry it's taking us longer than planned to get your cabinet ready for service. Please bear with us.
For all ADSL and WBC Fibre to the Cabinet (FTTC) services, the stable line rate will be determined during the first 10 days of service usage.
For FTTC Ranges A and B, the term "Clean" relates to a line which is free from any wiring issues (e.g. Bridge Taps) and/or Copper line conditions, and the term "Impacted" relates to a line which may have wiring issues (e.g. Bridge Taps) and/or Copper line conditions.
Throughput/download speeds will be less than line rates and can be affected by a number of factors within and external to BT's network, Communication Providers' networks and within customer premises.
The Stop Sale date for Datastream is from 30-Jun-2012; the Formal Retirement date for Datastream is from 30-Jun-2014. The Stop Sale date for IPstream is from 31-Dec-2012; the Formal Retirement date for IPstream is from 30-Jun-2014.
Where planned or expected availability dates are shown, these may be liable to change.
Note: If you decide to place an order for a WBC fibre product, an appointment may be required for an engineer to visit the end user's premises to supply the service.
The DP is external to the end user premises.
Please note that postcode and address check results are indicative only. Most accurate results can be obtained from a telephone number check.
Thank you for your interest."
I'm guessing that means I'll be waiting until around October time before I can get superfast broadband then.
Edited by MrSaffron (Thu 02-Jul-15 11:01:15)