First time user of this forum so if im posting in the wrong place I apologize in advance.
I am on an exchange only line and after serveral email to superfast lacashire (who are dealing with the rollout) ive had constant dissapointment with dates on when exchange only lines will be going superfast.
Today i checked roadworks.org and found http://imgur.com/bbFSwdk which leads me to believe that this is for exchange only lines as the exchange is where the X is ive drawn on the picture,
From this description, are they building a new telphone and fibre cab? and if so, can you tell me if this should be for EO lines?
Many Thanks
Chris
Edited by deleted (Sun 16-Aug-15 15:52:29)



Pages in this thread:
Print Thread
