I live in a rural area and preparations have been made to install fibre by the aerial route to our village [the cabinet housing is built and underground ducting has been laid between poles across one road junction.
I have 2 poles on my property but arranged with Open Reach 7 years ago to bury the cables between them. The existing ducting between these poles is still accessible with pull-through rope available at both ends. Obviously laying an aerial fibre cable across my property would defeat the purpose and cost of that work.
Does anyone know if the contractors will automatically follow the existing copper route through my ducting in laying the fibre cable? How would I ensure they do so?
I would value any knowledge available on this
Des



Print Thread
