Is there any way to get a better estimate of timing for a specific cabinet upgrade which is in the field survey stage? I am particularly looking at cabinet 6 at the Park Street exchange.
Also, I am helping some people with broadband and some are connected to cabinet 6 which is in the field survey stage and some to cabinet 7 (both at the Park Street exchange) which has no planned roll out. The openreach website shows the cabinets at the same location so I assume this is just a generic location - is there any way to see exactly where each one is?
Thank you



Print Thread
deleted