|
The cab serving my line was installed in jan, and ever since the openreach checker has said my line is now at the 'CONNECT' stage. Ever since the builders left the area, nobody has been back to the cabinet to install cables from the existing PCP or been inside the new cab. Why has no one been back since the cab was placed onto its base?
|