Any idea if this will be enabled for FTTx in the near future? Looking at an apartment around there and it says 1mbit ADSL is all that is available there.
This is going to be a huge downgrade from 1gig symmetrical on hyperoptic...
Well I did a very quick look at the cabinet for that exchange due to not knowing what the postcode or cabinet was and I can see the following:
Cabinets 3, 20, 23, 25, 26, 28, 44, 45, 64, 71, 73, 74, 75, 83, 90, 92, 94, 98, 100, 104, 105, 109 along with several EO Blocks has no information that I can see of when there will be fibre.
Cabinet E_2 - FTTC doing Design, live due by January 2017 - Phase LEP 17a
Cabinet 13 - FTTC doing Field Survey, live due by October 2016 - Phase LEP 16b
Cabinet 36 - FTTC being Built(Building Stage), live due by June 2016 - Phase LEP PLUS 16b
Cabinet 57 - FTTC being Built (Building Stage), live due by June 2016 - Phase LEP 15a
Cabinet 95 - FTTC doing Field Survey, live due by October 2016 - Phase LEP 16b
Please note they are running behind with the installs, so the dates might be a lot later.
Paul