Hi all.
Currently on a exchange only line in Kiveton and have been told to expect it between October and December.
Checked roadworks.org today and it shows the below.
Location: (PCP17) OPPOSITE JUNCTION WESLEY ROAD ON, STATION ROAD...
Description: Install 2m of 2 poly ducts in Footway,Provide 1 Cabinet and base (NGA cabinets)...
The interesting thing is that as far as I'm aware there's no cabinet 17 in Kiveton and if there is it's definitely not in the location above.
Is this likely to be a cab for fibre and a separate PCP or maybe a all-in one?



Print Thread
