The EIPs usually document changes that will impact the way that CPs interact with Openreach.
"R3250" was apparently released last September, "R3300" was last November, and "R3350" is due next week.
R3250 says
G.Fast LD: VDSL to G.fast technology change modify via handback
R3300 says
Downstream handback threshold (10th percentile) on eMLC (to display the handback threshold on eMLC and use it to judge whether a line is eligible for handback in T2R)
R3350 says
G.fast: Full Test on Handback support
R3350 also includes an item as part of SOGEA:
Automated Handback Eligibility Check



Pages in this thread:
Print Thread
