I moved to a new build house three 5 months ago, first initially they installed copper wire to property then they realised they laid the wrong cable as they should laid the optic fibre cable to the whole estates, and they finished all the work last month and I have asked the company who laid the cable saying they are under instruction Openreach to laid fibre to the whole estates and all the property will get FTTP . However the DSL checker still doesn't show that I should be able to order FTTP. When will this update?
Do the Exchange Cabinet need to upgrade before FTTP can be order?
Current Download wired is 1mb, wirelss is between 0.2-0.4mb.
Edited by deleted (Wed 03-May-17 10:17:25)



Pages in this thread:
Print Thread
