|
|
|
Is there any FTTP somewhere in the West MIdlands area post code so I could move to other area. Cuckoo Oak could be my last FTTC this year before I can move my house from Telford to West Midlands area (that must have FTTP)
|
|
|
West Midlands is a big area https://labs.thinkbroadband.com/local/broadband-map#... shows the rough area with each dot being native GEA-FTTP
|
|
The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.
|
|
|
|
What's the obsession with FTTP?
What is your virgin connection allowing you to do that your FTTC didn't?
What do you expect FTTP will allow you to do that your Virgin connection won't?
|
|
Register (or login) on our website and you will not see this ad.
|
|
|
If anywhere gets FTTP in Telford it'll be Wellington, they get everything first.
All the big industrial / office areas are well covered by Virgin, no need for it.
-
BT BroadbandInfinity 2
|
|
|
|
Of course we need it, FTTP is far more superior than Virgin Media's oversubscribed FTTC and it works. Why should you only have one high speed provider when you could have a choice.
Regards
|
|
|
|
Was told that Telford will not be planning future on FTTP. Only FTTC, G.Fast and FTTPoD for now.
Telford are expecting to roll out G.Fast by 2018.
|
|
|
FTTP is available for some areas of Telford. My address, TF2 near ASDA, Donington Wood; went live 2 weeks ago with FTTP, packages up to 300mb.
Look on 'superfast telford' or you can type in postcodes on
https://www.homeandbusiness.openreach.co.uk/fibre-br...
|
|
|
You are probably mistaken with FTTP mean to be FTTPoD see below
BT BROADBAND AVAILABILITY CHECKER
Address SITE OFFICE/ASDA CAR PARK, ST GEORGES ROAD, DONNINGTON, TELFORD, TF2 7RX on Exchange OAKENGATES is served by Cabinet 10
Featured Products
Downstream Line Rate(Mbps)
Upstream Line Rate(Mbps)
Downstream Range(Mbps)
WBC FTTP Availability Date
FTTP on Demand 330 30 -- Available -- -- --
ADSL Products
Downstream Line Rate(Mbps)
Upstream Line Rate(Mbps)
Downstream Range(Mbps)
Availability Date
WBC ADSL 2+ Up to 5 -- -- Available -- -- --
WBC ADSL 2+ Annex M Up to 5 Up to 0.5 -- Available -- -- --
ADSL Max Up to 4 -- -- Available -- -- --
WBC Fixed Rate 2 -- -- Available -- -- --
Fixed Rate 2 -- -- Available -- -- --
Other Offerings
Availability Date
VDSL Multicast -- -- -- Available -- -- --
ADSL Multicast -- -- -- Available -- -- --
Edited by adslmax (Tue 26-Sep-17 13:08:09)
|
|
|
|
defo FTTP, but not putting in my full postcode, but served by cabinet 32, from Hollingswood exchange.
Fibre master socket fitted next week on 76mb package.
|
|
|
defo FTTP, but not putting in my full postcode, but served by cabinet 32, from Hollingswood exchange.
Fibre master socket fitted next week on 76mb package. Looking at the information your exchange doesn't do FTTP, it only does FTTC and FTTPod.
Can you do a screen shot of what the DSL Checker displays for your address or phone number, you ca scribble out your address or phone number.
Paul
|
|
|
No need I can see some FTTP on that exchange
|
|
The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.
|
|
|
Some folk seem so cynical. As if someone would lie about having FTTP
|
|
|
|
Impossible. Any proof of it please.
|
|
|
defo FTTP, but not putting in my full postcode, but served by cabinet 32, from Hollingswood exchange.
Fibre master socket fitted next week on 76mb package.
Proof screenshot please but u can edited out your full post code
|
|
|
|
here is full list of all cabinets in Hollinswood:
Fibre Cabinet Fibre Status Phase Properties
Passed Vendor Approx
Post Code
Cabinet P1 FTTC Available from 8th June 2017 Phase SEP Telford and Wrekin 18a 331 Huawei TF3 3BJ
Cabinet P2 FTTC Available from 16th June 2017 Phase SEP Telford and Wrekin 18a 84 Huawei TF3 3BB
Cabinet P3 FTTC Available from 16th June 2017 Phase SEP Telford and Wrekin 18a 35 Huawei TF3 4AG
Cabinet P4 FTTC Available from 17th June 2017 Phase SEP Telford and Wrekin 18a 36 Huawei TF2 9FN
Cabinet P5 FTTC doing Design, live due by January 2017 Phase SEP Telford and Wrekin 17b Huawei TF3 4AF
Cabinet P6 Fibre Not Available TF2 9NN
Cabinet P7 Fibre Not Available TF3 4HZ
Cabinet P8 Fibre Not Available TF3 4NB
Cabinet P9 Fibre Not Available TF3 4HB
Cabinet P10 FTTC Available from 17th June 2017 Phase SEP Telford and Wrekin 17b 27 Huawei TF3 3AA
Cabinet P11 FTTC Available from 2nd June 2017 Phase SEP Telford and Wrekin 18a 117 Huawei TF2 9UR
Cabinet P12 FTTC Available from 10th January 2014, some with 18/2M product Phase 10a 2013 603 Huawei TF2 9PG
Cabinet P13 Fibre Not Available TF3 3BH
Cabinet P14 Fibre Not Available TF3 4AS
Cabinet P15 FTTC Available from 5th May 2017 Phase SEP Telford and Wrekin 18a 66 Huawei TF11 8TG
Cabinet P16 Fibre Not Available TF3 4DU
Cabinet P17 Fibre Not Available TF3 3AP
Cabinet P18 FTTC Available from 29th June 2017 Phase SEP Telford and Wrekin 18a 67 Huawei TF3 4BZ
Cabinet P19 FTTC Available from 12th December 2013 Phase 10a 2013 581 Huawei TF3 2DD
Cabinet P20 Fibre Not Available TF3 2BU
Cabinet P21 FTTC Available from 4th February 2014 Phase 10a 2013 412 Huawei TF3 2BA
Cabinet P22 FTTC Available from 6th December 2013 Phase 10a 2013 386 Huawei TF2 9QS
Cabinet P23 FTTC Available from 14th December 2013 Phase 10a 2013 588 Huawei TF2 9NT
Cabinet P24 FTTC Available from 16th June 2017 Phase SEP Telford and Wrekin 17b 66 Huawei TF3 4AA
Cabinet P25 Fibre Not Available TF2 9TX
Cabinet P26 Fibre Not Available TF2 9TU
Cabinet P27 FTTC Available from 1st July 2017 Phase SEP Telford and Wrekin 17b 28 Huawei TF2 9TW
Cabinet P28 FTTC Available from 5th May 2017 Phase SEP Telford and Wrekin 17b 36 Huawei TF3 3AD
Cabinet P29 Fibre Not Available TF2 9TY
Cabinet P30 Fibre Not Available TF3 4AW
Cabinet P31 FTTC Available from 15th June 2017 Phase SEP Telford and Wrekin 17b 94 Huawei TF2 9NG
Cabinet P32 Fibre Not Available TF2 9FZ
Cabinet P33 Fibre Not Available TF3 3AH
Cabinet P34 FTTC Available from 14th June 2017 Phase SEP Telford and Wrekin 17b 206 Huawei TF2 7NH
Cabinet P35 FTTC Available from 6th December 2013 Phase 11a 2013-2014 242 Huawei TF2 9FD
Cabinet P36 Fibre Not Available TF2 7NA
Cabinet P37 FTTC being Built, live due by November 2016 Phase SEP Telford and Wrekin 17b Huawei TF3 4BS
Exchange 1 Fibre Not Available TF3 4EA
Exchange 2 Fibre Not Available TF3 3AY
|
|
|
No need I can see some FTTP on that exchange
Well I just checked every address on cabinet 32 which the OP said they are on and The Openreach Checker says only FTTC.
Granted SamKnows says the exchange does support FTTP, sadly I am not going to check all ~9K NADKeys to find out LOL, but SamKnows has been wrong loads of times before.
My bad, I was looking at the wrong exchange LOL.
I found at least four addresses with FTTP on cabinet 32 on their exchange.
Paul
Edited by PaulKirby (Tue 26-Sep-17 14:54:20)
|
|
|
|
All cabinets 32 isn't on FTTC nor FTTP or FTTPoD at the moment say BT Checker.
Exchange HOLLINSWOOD is served by Cabinet 32
ADSL Products
Downstream Line Rate(Mbps)
Upstream Line Rate(Mbps)
Downstream Range(Mbps)
Availability Date
WBC ADSL 2+ Up to 2.5 -- 1 to 4 Available -- -- --
ADSL Max Up to 2 -- 1 to 3.5 Available -- -- --
WBC Fixed Rate 1 -- -- Available -- -- --
Fixed Rate 1 -- -- Available -- -- --
Other Offerings
Availability Date
ADSL Multicast -- -- -- Available -- -- --
|
|
|
Well I just checked every address on cabinet 32 which the OP said they are on and The Openreach Checker says only FTTC.
Granted SamKnows says the exchange does support FTTP, sadly I am not going to check all ~9K NADKeys to find out LOL, but SamKnows has been wrong loads of times before.
Paul
Trust me there isn't no FTTP or FTTC on this cabinet nor in Hollinswood exchange for FTTP
Exchange name: Hollinswood
Exchange status: Fibre enabled
Cabinet number: 32
Technology: -
|
|
|
I also agree, but that data is at least 2 to 3 Months old and doesn't prove that somebody doesn't have FTTP.
Take a look at Ilford Central (LNILC) cabinet 24 (my Cabinet), it says the following:
Fibre: From 27th July 2011 Type: FTTC, FTTP, FoD
BT Exchange: Ilford Central Exchange Code: LNILC
Cabinet P24 FTTC being Built, live due by December 2017 Phase 18b Huawei E12 5AA
Yet I have FTTP, so its possible, all I can say is I checked all addresses that I know of which is on Oakengates (WNOAK) cabinet 32 and none of them mention FTTP.
Paul
|
|
|
Is your postcode either of these two TF2 9#X or TF2 9#N ?
You can PM me if you don't want to say publicly.
Paul
|
|
|
|
Also bare in mind that some new build postcodes which have FTTP don�t appear against a cabinet on codelook at all, as the postocdes are not associated with a cabinet.
NE27 0GN for example.
|
|
|
Fair enough, I assume the phone lines are all FVA then.
But certed mentioned cabinet 32, so what you said wouldn't be the case here.
But after a few moments checking the database I found at least 4 addresses where their copper lines go to cabinet 32 have FTTP available to them.
So I can say yes.
Paul
|
|
|
|
Fair point. Must be a new build house then.
|
|
|
|
|
|
The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.
|
|
|
|
All newbuilds with FTTP only have no choice but to have FVA, or, use VoIP.
|
|
|
Nah.
Still don�t believe you, not enough evidence.
You need to take a video of your face next to the ONTE holding up a letter showing the address.
|
|
|
|
Thanks but it good to know that Telford got few FTTP at least! Hope it rolling out more in the future.
|
|
|
defo FTTP, but not putting in my full postcode, but served by cabinet 32, from Hollingswood exchange.
Fibre master socket fitted next week on 76mb package.
U could be better off with full 330/30 on FTTP to save cost in future as FTTP cost is lots cheaper now than FTTP on 80/20.
|
|
|
Urm - please explain what you mean
GEA-FTTP 330/30 is NOT cheaper than GEA-FTTP 80/20
At a guess you may be confusing some of the promotional pricing that has been in place for G.fast
|
|
The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.
|
|
|
|
I think I got mix up with g.fast pricing. Apology.
|
|
|
Nah.
Still don�t believe you, not enough evidence.
You need to take a video of your face next to the ONTE holding up a letter showing the address.

You forgot the News Paper with todays date on it LOL
Paul
|
|
|
Was told that Telford will not be planning future on FTTP. Only FTTC, G.Fast and FTTPoD for now. Who told you this?
|
|
|
https://twitter.com/MrSaffron/status/912679489653571584
That postcode wasn't linked to that exchange and cabinet on a certain site, well it was sort of, but not when you list the post codes for a cabinet, that's why I missed that postcode.
But not all on that postcode can get FTTP due to its not all completed yet (i.e. some are still in scope to be done).
Paul
|
|
|
All newbuilds with FTTP only have no choice but to have FVA, or, use VoIP.
Yup, I agree, no point in putting in two lost of cables to later on remove the copper.
Forcing FVA makes sense.
Paul
|
|
|
Telford has suffer a very big loss of water with STW repaired the largest bigger pipe ever! Ongoing working non-stop since last Sunday 4am. STW provide me 12 bottles of free water.
https://pbs.twimg.com/media/DKpgClLUEAA50Ox.jpg:large
https://pbs.twimg.com/media/DKpgpoBUEAEVhQj.jpg:large
Edited by adslmax (Tue 26-Sep-17 15:32:26)
|