Hi, Over the past couple of weeks I've noticed that FTTP connectorised blocks have been installed on 2 of our poles; one right outside our which connects our property. 'Superfast Broadband Hampshire' are estimating end of 2018 for our postcode. However speaking to a Openreach engineer; sounds like could be a lot sooner and to 'keep checking availability'.
https://ibb.co/gMR0Cb - our pole
Anybody able to explain the potential steps for installing this type of Fibre (under subsidy funding)? Appreciate it is different fro every installation; but keen to grasp if this is in the 'later' stage of the installation rather then early.
Many thanks,
Aaron.



Pages in this thread:
Print Thread
