Summary: Moved into a new build property mid September. House already equipped with BT OR ONT for FTTP. After several weeks and some engineering work, PON light steady green. Wholesale address checker and BT retail indicate OK to order service since late October.
Service was ordered through BT retail. First order was cancelled and re-ordered on to port 2 as they didn't understand why the order didn't go through.
BT retail (FTTP team) have since advised there is a capacity issue. Cablelinks required is what I'm being told. The date for this to happen is always 2 weeks after the last time it was queried. e.g on 2nd November told 16th November. 13th November told 27th November. Neighbours are also getting told the same thing. I suspect this date is going to keep moving. All I want is a realistic date when we might be able to receive a service.
Is there anything else I can do in this situation?