Picture here
Unless I'm mistaken, that's a fibre connection point.
Downside is, they did 2 grids on the opposite side of the road. I have a grid my side which I assume they will be doing soon.
Good to see the speed of rollout. I don't suppose anyone could guess on how long until you can order?
I assume you can't connect to the opposite side of the road, so I will need to wait until my grid is done.
Thanks
Edited by oldskool (Thu 05-Mar-20 11:41:07)