Hi,
I am on cabinet P4 on the Benwick, Cambridgeshire exchange. It was installed last year and the date FTTC was supposed to go live was August 2019. Since then I have been tweeting openreach every month or two and each time get told it is due to go live at the end of the month. I was wondering if anybody could shed any light on what is going on?
Thanks
Jonathan



Print Thread
