All CBTs were installed back in January and all the subsequent work looks to have been completed so far.
The road is long and fed from two directions,
The bottom half of the road is fed all overhead and went live to order this week as per the wholesale checker.
The top half of the road is also overhead but hasn’t gone live to order yet.
I’m sitting in the “middle” of all this as it appears, my DP currently serves about 8 copper lines off the top of the pole about numbers 74-86.
Numbers 74 & 76 can order FTTP but numbers 78-86 of which I am one can’t order. All served from the same DP and it has a CBT on it fed from the top of the road which isn’t active to order yet.
The same is happening on the odd numbered side of the road as well from the same DP. Numbers 41 and 43 can order but number 45 can’t.
It all seems rather odd to me. I’ve done some checking on the router the top half of the road is fed from and that street can all order apart from the last two houses. So it looks like there’s a big stretch that can’t order while people around them can.
I can post link to maps and wholesale checkers below
https://ibb.co/ysd2pCN - can order FTTP
https://ibb.co/3dNBTK3 - can’t order FTTP
Any insights into this would be greatly appreciated.