Standard User Thaumaturge
(member) Thu 20-Jul-23 19:59:59
Print Post

OR Fibre checker pages


[link to this post]
 
What's the difference between this Openreach page (1) and this one (2)?

If I put my postcode into a box on (1) that says it checking for "Full Fibre", it tells me that "Ultrafast Full Fibre" is "build planned between now and Dec-2026" (and that Superfast Full Fibre, aka FTTC, is available now).

Whereas if I do the same the same thing in the "Check your postcode" box in the top LH corner of the map on (2), it tells me that "we[OR] don't have any major plans to build in this exchange". My exchange area appears on the map as a forlorn area of white completely surrounded by green, blue, orange, and black areas (it's by no means unique in that regard).

I understand that it is impossible to keep all pages of a website up to date and consistent at all times. But these pages have been like this for over 3 months now, and (2) claims that "Openreach will update the build information at least every three months" and this page "regularly".

Is it perhaps in the weasel wording? Maybe my exchange is "planned" but not "announced", whatever that is, which would qualify it for inclusion on (2). Or perhaps it's not in "major" plans but some other kind of plans. If so, what might these be?
Standard User rippedcotton
(experienced) Fri 21-Jul-23 10:15:38
Print Post

Re: OR Fibre checker pages


[re: Thaumaturge] [link to this post]
 
I can't offer a definitive view of the difference, but I can say that in my area the 2nd link shows the same status of "we're building" for my actual address (where I was initially told that FTTP would be available in June 2023, subsequently changed to September 2023) and another area a couple of miles away where FTTP is already available (it's on a different exchange but this is often irrelevant for fibre provision, I know that the fibres into our FTTC cabinet do not come from our actual exchange but instead from the direction of the exchange supplying these FTTP customers).

I keep an eye on local utility activity using one.network, this shows roadwork-related sites. Openreach repeatedly showed activity in my village over the last few months but only 1 in 3 or 4 of these sites actually had any work done as scheduled. Then another scheduled site appeared for this last Wednesday, and now several telephone poles on the main road have fibre CBTs fitted. Another update shows 4 days of traffic-light-controlled work starting on Monday right where my road joins the main road. The lesson being that even this close to the service being made available things can move by 3 months at the last minute.

Given that your area is up to 3 years away from provision I can't suggest anything beyond keeping an eye on the various sites you already know about. There is also https://bidb.uk/ which allows you to see what is being worked on and existing installations, might help, or might just make you cry.

--

Brian

UW (Talktalk via openreach FTTC) - 80/20 sync
Standard User BLaZiNgSPEED
(committed) Fri 21-Jul-23 16:38:20
Print Post

Re: OR Fibre checker pages


[re: Thaumaturge] [link to this post]
 
I believe one of them is for the Openreach postcode checker looking specifically at that address (postcode) to see if there are plans.

The other link is for the exchange area.

So for example if I enter my postcode it will show "Not yet available" and "Build not announced".
At the moment, our Ultrafast Full Fibre build plans don’t include your area but things can change and we're announcing new build across the country all the time.

Provide us with your information below and we’ll let you know immediately if our build plans change to include your area.
However, in the Where and When it will show "Great News! We're building in this exchange".

All of this is very vague. Although it may show plan for my Bishopsgate Exchange here in Central London my postcode has no plan. Initially it showed as plan last year but for only one of the Caretakers room address of my building but all other addresses showed as No plan.

This means that Openreach may upgrade certain postcodes within that exchange but leave out the others. So far from my research very few postcodes here in Central London were showing as plan now until December 2026. Almost all postcodes showed no plan!


Register (or login) on our website and you will not see this ad.

Standard User Taras
(eat-sleep-adslguide) Tue 22-Aug-23 22:05:07
Print Post

Re: OR Fibre checker pages


[re: BLaZiNgSPEED] [link to this post]
 
In reply to a post by BLaZiNgSPEED:
I believe one of them is for the Openreach postcode checker looking specifically at that address (postcode) to see if there are plans.

The other link is for the exchange area.


Yup and they may be different.
Standard User chriswillsher
(regular) Wed 23-Aug-23 21:22:32
Print Post

Re: OR Fibre checker pages


[re: Thaumaturge] [link to this post]
 
The OR fibre checker now seems to be useless in Scotland. The exchange map shows completed exchanges (not many outside the main urban conurbations) and limited plans elsewhere. Most of the landmass shows "no plans". I am aware of the R100 programme but can find no way to check progress or even if any specific postcode is included.
I am lucky as I have recently moved to a full fibre area but I was trying to find out plans for friends and relatives who live elsewhere and are struggling with very slow ADSL speeds from distant exchanges.
One used to be able to enter a postcode at www.scotlandsuperfast.com and get some form of response. Now there seems to be no indication at all. Can anyone point me to a link that will provide any useful information on the plans for rural Scotland?
Maybe the powers that be are so embarrassed that the plans have gone the way of most political promises?

--------------------------------------------------------------------------
Zen FTTP 900. FRITZBox! 7530. Router wi-fi off.
Ubiquiti POE switch and Ubiquiti U6-LR UniFi LR mounted in ceilings giving Wi-Fi 6 throughout house.
Zen DV with FRITZFon! M2 phones. Mobile EE.
Computing since 1981 with ZX81
Standard User pyarwood
(newbie) Thu 12-Oct-23 23:55:25
Print Post

Re: OR Fibre checker pages


[re: Thaumaturge] [link to this post]
 
The 2 different results are correct the one with the date is generic no date yet set but we aim to FTTP the while country by december 2026 and the other is work has not actually started yet.

if that makes sense
Standard User Thaumaturge
(member) Fri 13-Oct-23 11:40:53
Print Post

Re: OR Fibre checker pages


[re: pyarwood] [link to this post]
 
I understand there could be a difference between connecting an exchange area and connecting individual postcodes within it. But as an explanation for the apparent discrepancy, it doesn't really stack up. In my case the postcode (1) shows as by 2026, but the exchange area (2) as no build planned. Refs to my OP.

As for leaving some postcodes unconnected, of course OR *may* do that, but they are incentivised otherwise (so that they don't just build enough of an exchange area to discourage Altnet competition, then move on somewhere else and do the same). They can't declare an FTTP priority exchange (the "tranches") and initiate a copper stop-sell until they have 75% coverage in an exchange area. And they will probably not be able to move further along the process of switching off copper completely until they have achieved very close to 100% coverage.
Standard User Pheasant
(eat-sleep-adslguide) Fri 13-Oct-23 12:58:25
Print Post

Re: OR Fibre checker pages


[re: pyarwood] [link to this post]
 
The long standing target was 25M premises (homes and business) by end of 2026, however that’s well shy of the entire country. That may take quite some time longer 😎
Standard User Taras
(eat-sleep-adslguide) Fri 13-Oct-23 13:03:41
Print Post

Re: OR Fibre checker pages


[re: Thaumaturge] [link to this post]
 
In reply to a post by Thaumaturge:
I understand there could be a difference between connecting an exchange area and connecting individual postcodes within it. But as an explanation for the apparent discrepancy, it doesn't really stack up. In my case the postcode (1) shows as by 2026, but the exchange area (2) as no build planned. Refs to my OP.


It makes sense, one is saying if your house is in OR's plans(by 2026/12) and the other is when Openreach are likely to start building in your exchange area ..
Standard User Thaumaturge
(member) Sat 14-Oct-23 10:38:39
Print Post

Re: OR Fibre checker pages


[re: Taras] [link to this post]
 
In reply to a post by Taras:
It makes sense, one is saying if your house is in OR's plans(by 2026/12) and the other is when Openreach are likely to start building in your exchange area ..

Sorry, still confused. How are you suggesting that OR will connect up my postcode (and several neighbouring ones that I've tried) by 12/2026 without building in my exchange area in the same timeframe?