Indeed they were working on the pavement outside my house digging up the pavement and I think more copper work as my line dropped (FTTC) once when an OR engineer was in a pit near me.
Do they get orders in first for the area then roll out the fibre network or is it on an adhoc basis where fibre is laid per order.
I cant order yet as I still have til Oct 26 under contract with TTB. I did enquire if TTB could upgrade me in the meantime and got some prices but the sales agent said he hadn't got a price for installation and would email OR as I wasn't on the system but heard nothing since and it has been a few weeks now.
What's the procedure? All the copper round here is underground and my property had a duct put in too to replace an aerial cable incorrectly put underground in the 1980s.
Tim
talktalkbusiness.net & freenetname
Asus RT-AC68U and ZyXEL VMG1312-B10A Bridge on 80/20 Meg Fibre
Speed Test
Highest Sync: 79993/19661
BQM
talktalkbusiness.net & freenetname
Asus RT-AC68U and ZyXEL VMG1312-B10A Bridge on 80/20 Meg Fibre
Speed Test
Highest Sync: 79993/19661
BQM



Pages in this thread:
Print Thread
Banger