Standard User thedotlair
(newbie) Mon 02-Nov-26 15:55:46
Print Post

Copthorne FTTP Deployment - Location Specific Information


[link to this post]
 
Hi,

Wondering if there is any information outside of BIDB, Openworks and the BT FIbre Checker to understand the deployment of FTTP in this specific area.

So far I've spoken to BT's Fibre Team via email who have confirmed that they have an intention to deploy FTTP in my specific postcodes (RH10 3XD or RH10 3XQ. RH10 3XG near me has been on 'we're building now for quite a while (i.e. around 2 months) but only in so much as 'within the next year' which isn't helpful - mainly as there is no reference date to say when the status was changed to that. So far they've missed a September 2026 deadline and have now stated December 2026 but refuse to answer anything more until at least the end of January 2027.

HeyBroadband are also in the area but stop around 200 meters from properties, so around 10-15 impacted properties of getting their FTTP service as well. They use PIA so no doubt will be reliant on Openreach to correct the remedial infrastructure (ducting).

Doing tracking over the past 4 months, I've seen large expansions to the West, North and South of these postcodes but nothing impacting them directly.

Appreciate that it's a moving target and they only have so much resource so just looing to understand to support myself and my neighbours that are limited to 20mb VDSL/SOGEA)
Standard User Pheasant
(eat-sleep-adslguide) Mon 02-Nov-26 18:29:01
Print Post

Re: Copthorne FTTP Deployment - Location Specific Informatio


[re: thedotlair] [link to this post]
 
I'd love to say there was, but there basically isn't. The deployment plans are a fluid beast.

You can keep monitoring all the sources that you are already and it may give you some indications, but that's about as far as it goes.

Directly approaching Openreach will typically result in a vague (at best) answer.
Administrator MrSaffron
(staff) Mon 02-Nov-26 18:51:21
Print Post

Re: Copthorne FTTP Deployment - Location Specific Informatio


[re: thedotlair] [link to this post]
 
https://labs.thinkbroadband.com/local/broadband-map#... lets you select up to a year in advance, but most roadworks are not announced that far ahead, also up to 14 days in the past.

The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.


Register (or login) on our website and you will not see this ad.

Standard User Taras
(eat-sleep-adslguide) Mon 02-Nov-26 20:37:48
Print Post

Re: Copthorne FTTP Deployment - Location Specific Informatio


[re: Pheasant] [link to this post]
 
In reply to a post by Pheasant:
I'd love to say there was, but there basically isn't. The deployment plans are a fluid beast.

You can keep monitoring all the sources that you are already and it may give you some indications, but that's about as far as it goes.

Directly approaching Openreach will typically result in a vague (at best) answer.


Yup and vaguness will apply until its RFS. OR works in quarters and if you get anything shorter than than that, its striking gold. I'm not digging OR but that is how or works and with large field work that is understandable
Standard User thedotlair
(newbie) Wed 04-Nov-26 07:52:55
Print Post

Re: Copthorne FTTP Deployment - Location Specific Informatio


[re: Pheasant] [link to this post]
 
Really appreciate everybody's replies to this. Now a case of patiently waiting for our turn to appear on the deployment plan and hope Openreach don't suddenly u-turn smile
Standard User Taras
(eat-sleep-adslguide) Wed 04-Nov-26 10:40:38
Print Post

Re: Copthorne FTTP Deployment - Location Specific Informatio


[re: thedotlair] [link to this post]
 
In reply to a post by thedotlair:
Hi,

Wondering if there is any information outside of BIDB, Openworks and the BT FIbre Checker to understand the deployment of FTTP in this specific area.


you will only understand what's gone live, and you will have no indication of issues present.

In reply to a post by thedotlair:
So far I've spoken to BT's Fibre Team via email who have confirmed that they have an intention to deploy FTTP in my specific postcodes (RH10 3XD or RH10 3XQ. RH10 3XG near me has been on 'we're building now for quite a while (i.e. around 2 months) but only in so much as 'within the next year' which isn't helpful - mainly as there is no reference date to say when the status was changed to that. So far they've missed a September 2026 deadline and have now stated December 2026 but refuse to answer anything more until at least the end of January 2027.

OR lives in quarters. Plus money gets pushed around - ie money that's there for a simple ducting infrastructure install; the install goes fine except for 20 houses that are direct burrial (dig) might not have the funds there to complete the area install. Those house may need to wait for the infill team to come along. That means extra quarters.

it is frustrating. Add in less money from 27 to 30, those quarters may go to two quarters frown .


In reply to a post by thedotlair:
HeyBroadband are also in the area but stop around 200 meters from properties, so around 10-15 impacted properties of getting their FTTP service as well. They use PIA so no doubt will be reliant on Openreach to correct the remedial infrastructure (ducting).


Also could be a funding issue.

In reply to a post by thedotlair:
Doing tracking over the past 4 months, I've seen large expansions to the West, North and South of these postcodes but nothing impacting them directly.

Appreciate that it's a moving target and they only have so much resource so just looing to understand to support myself and my neighbours that are limited to 20mb VDSL/SOGEA)


I can't remember how OR quarters are numbered, if its finanical or their own. Regardless wait till feb, and then email them with your details and the 20 or so others(with their consent) so that they know the demand is there
Standard User thedotlair
(newbie) Thu 19-Nov-26 07:00:32
Print Post

Re: Copthorne FTTP Deployment - Location Specific Informatio


[re: Taras] [link to this post]
 
Thanks Taras and everybody for your replies.

Received a proper answer from Openreach - specifically the Executive Complaints and Escalations Team on 17th November

* Cannot provide other affected properties as commercially sensitive (understandable).
* Ducting works aren't related to my property specifically - more within the wider Openreach network.
* No community-funded projects available to support FTTP.
* No build plans in place to bring Full Fibre, and unable to advise when your address may next be reviewed for inclusion in a future rollout programme.
* Only recommendation is to keep checking the Fibre Checker.

20 minutes before this I got a notification from BT saying that my address had moved into a we're building in your area now' status.

Bit of a mess in terms of consistent communication

Edited by thedotlair (Thu 19-Nov-26 08:25:42)

Standard User thedotlair
(newbie) Wed 25-Nov-26 17:31:37
Print Post

Re: Copthorne FTTP Deployment - Location Specific Informatio


[re: thedotlair] [link to this post]
 
Final update from me on this - it's going to be a long journey so better to put my energies else where and use what I have available smile

Openreach have formally confirmed that the build plans now show the work planned to include my premises and the other 6 properties is no longer going ahead. Rather then being cancelled altogether the project is a live project but with no funding approved and no completion date scheduled. frown

So with this, the properties here (around 6-8) are in limbo until BDUK are given the correct information by BT for the next OMR and they're reclassified as 'Under Review' at which point we could potentially request an addition to the existing Project Gigabit contract (I know I know - wishful thinking).

I genuinely thought that such situations were limited to remote locations such as farms or those that span huge distances - rather than a built up commuter town/
Standard User FibreBubble
(fountain of knowledge) Wed 25-Nov-26 18:27:33
Print Post

Re: Copthorne FTTP Deployment - Location Specific Informatio


[re: thedotlair] [link to this post]
 
Looking at Google maps you can see the issue is a lot of directly buried plant.

There will be ducts taking, say a copper 50prs around to boxes whereupon the last 20 or 10pr underground DP cables will be directly buried. Or the individual lead ins directly buried radially to the houses. You can see scarring where lead ins have been retrospectively ducted on copper repair and where boxes have been dropped on buried joints. Could be eventually a candidate for poles.

I have seen a lot of places being dropped from 'building now' to 'no plans' around Mid Sussex as we enter the end of the commercial mass rollout and I expect this will be happening all over.

If it's not you moaning then it's probably me

Edited by FibreBubble (Wed 25-Nov-26 18:42:37)